(Summary description)Guixi Sanyuan Metal Co., Ltd. Annual Output of 2000 Tons of Refined Bismuth and 1000 Tons of Tin Ingots Project
Announcement of Guixi Sanyuan Company's Tin Ingot Project
(Summary description)Guixi Sanyuan Metal Co., Ltd. Annual Output of 2000 Tons of Refined Bismuth and 1000 Tons of Tin Ingots Project
- Categories:Company News
- Author:
- Origin:
- Time of issue:2011-02-23
- Views:0
Guixi Sanyuan Metal Co., Ltd. Annual Output of 2000 Tons of Refined Bismuth and 1000 Tons of Tin Ingots Project
The second announcement
One. Situation of the construction unit
Unit name: Guixi Sanyuan Smelting Chemical Co., Ltd.
Unit location: West of Baili Avenue, Guixi City
Contact name: Director Huang
Contact phone number: 13870176509
Postal code: 335425
2. Situation of Environmental Impact Assessment Units
Unit name: China Ruilin Engineering Technology Co., Ltd.
Unit location: No. 1 Bayi Avenue, Nanchang City
Contact name: Du Gong
Contact phone number: (0791) 6283087
Postal code: 330002
3. Approval unit
Jiangxi Provincial Department of Environmental Protection Tel: 0791—8591189
4. Project construction status
(1) Construction project name: Guixi Sanyuan Metal Co., Ltd. annually produces 2,000 tons of refined bismuth and 1,000 tons of tin ingots.
(2) Construction unit: Guixi Sanyuan Smelting Chemical Co., Ltd.
(3) Construction site: In Guixi Industrial Park, the geographic coordinates of the center of the site are 117°8'42.64", north latitude 28°16'19.04".
Guixi City is located in the northeastern part of Jiangxi Province, where the Zhejiang-Jiangxi Railway, the Yingxia Railway, and the Anhui-Jiangxi Railway intersect and run through the entire territory. The railway within the territory is 133km long. The highways 320 and 206 national roads pass through the urban area, while the Liwen section of the Shanghai-Russia Expressway passes through the north of Guixi City (about 5.5km). See attached picture 1 for geographical location and traffic conditions.
(4) Construction nature: new construction.
The main construction content of this project includes main engineering, auxiliary engineering, public engineering, environmental protection engineering, storage and transportation engineering, etc., as shown in Table 1.
List of main construction contents of the Table 1 project
Serial number |
Facilities name |
Construction content |
Description |
Main project |
Ball making workshop |
Area |
Rainproof, anti-corrosion and anti-seepage design. Annual processing of 18,000 tons of non-ferrous metal smelting waste. |
Raw material preparation workshop |
Area |
Ingredients warehouse ( |
|
Blast furnace workshop |
Area |
|
|
Fire workshop |
Area |
The fuel is natural gas. |
|
Electrolysis workshop |
Area |
With delivery pump. The heating fuel is natural gas. |
|
Reverberatory furnace workshop |
Area |
|
|
Fine Bismuth Workshop |
Area |
|
|
Vacuum distillation workshop |
Area |
Matching motor. |
|
Storage and transportation engineering |
Raw material field |
Area |
It can store about 1500t of raw and auxiliary materials, which can meet the production needs of 20 days. |
Liquid chlorine storage |
It is arranged in the refined bismuth workshop with an area |
With 4 storage tanks, the total storage capacity is 2t |
|
Public auxiliary Project |
Laboratory Center |
Area |
Responsible for the analysis and testing of raw materials and products. |
Machine repair room |
Area |
Responsible for equipment maintenance. |
|
Substation |
Powered by the industrial park, area |
The annual power consumption is 120000kwh. |
|
Water supply |
Water is supplied by the industrial park. Equipped with 2 hot water pumps and 2 cold water pumps |
The new water consumption is 43,200 m3/a. |
|
Office building |
Area |
The second floor meets the needs of administrative office. |
|
Staff dormitory |
arranged on the upper floor of the office building |
Meet the needs of employees to change shifts. |
|
Restaurant |
Area |
Meet the needs of employees’ lives. |
|
Garage |
Area |
Used for employee vehicle storage |
|
Environmental protection engineering |
Exhaust gas treatment facilities |
Including settling chamber, bag dust removal chamber, absorption tower (spray tower), exhaust pipe (chimney), etc. |
Treat blast furnace flue gas, reverberatory furnace flue gas, casting waste gas, and bismuth refining waste gas. |
Wastewater treatment facilities |
Set up a rainwater collection system, and the initial rainwater is discharged into the factory |
|
|
Solid waste disposal |
Set up a slag library ( |
Dispose of blast furnace slag, reverberatory furnace slag, lead chloride slag, zinc chloride slag, silver zinc slag, household garbage, etc. |
|
Greening |
Plant roads and buildings around the factory area to be greened. |
The greening coefficient is 20%, and the tree species that can absorb and filter acid gas and dust are preferred, and are suitable for local growth. |
5. Main production process
See the process flow chart for details.
production process flow chart of crude bismuth
6. Summary of pollutant emissions
(1) Pollutant discharge summary
The main pollution sources and their main pollutant discharges are shown in Table 3.
Pollutant name |
Single bit |
Amount produced |
Emissions |
Reduction |
|
Exhaust gas |
Total amount of smoke (waste) gas |
10,000 Nm3/a |
17352 |
17352 |
0 |
SO2 |
t/a |
127.4 |
12.9 |
114.5 |
|
Smoke |
t/a |
624.7 |
4.4 |
620.3 |
|
Lead dust |
t/a |
12.6 |
0.1 |
12.5 |
|
CO |
t/a |
0.003 |
0.003 |
0.0 |
|
NOX |
t/a |
7.1 |
0.7 |
6.4 |
|
Chlorine |
t/a |
0.6 |
0.1 |
0.6 |
|
Wastewater |
Total wastewater |
m3/a |
1.68 |
1.68 |
0.0 |
CODcr |
t/a |
4.2 |
3.0 |
1.2 |
|
BOD5 |
t/a |
3.36 |
2.4 |
1.0 |
|
SS |
t/a |
2.52 |
1.7 |
0.8 |
|
Solid waste |
Total waste residue |
t/a |
14505 |
0 |
14505 |
Production process waste |
t/a |
14400 |
0 |
14400 |
|
Household garbage |
t/a |
105 |
0 |
105 |
Seven. Evaluation conclusion
1) We must strictly implement environmental protection laws and regulations and the "three simultaneous" system, strengthen the management and treatment of production waste water, waste gas, noise, and solid waste, and all discharge indicators after treatment should meet national and local standards. Reduce the adverse impact on the surrounding environment.
2) During the trial production of the project, timely report to the local environmental protection authority for the acceptance of the pollution control facilities. After the acceptance is passed, the pollution control facilities can be officially put into operation, and the pollution control facilities and the main project can be operated at the same time.
3) After the project is put into production, environmental management should be strengthened to ensure the normal operation of environmental protection facilities to prevent all pollution accidents, especially to prevent accidental discharge. If abnormal conditions occur, immediately stop production for maintenance to avoid pollution. Due to the relatively complex composition of the raw materials in this project, changes in the composition of the raw materials may cause some pollutants to be discharged beyond the standard; if accidental discharge, the pollution will be more serious, so it needs to be managed in strict accordance with the process requirements.
4) Strengthen risk prevention measures to minimize the adverse impact of accidents on the environment.
5) Strengthen the transportation safety management of raw materials, various waste residues, and liquid chlorine and other hazardous chemicals, and strictly prevent leakage accidents during transportation and storage.
6) After the construction project is put into production, a post-evaluation of this project will be carried out to further verify the effectiveness of environmental protection facilities and propose targeted improvement plans.
In summary, the construction of the project conforms to the country’s industrial policy and is of positive significance for the comprehensive utilization of resources and the development of the local economy. The project site selection is appropriate, the construction conditions are relatively good, and the environmental protection measures for pollution prevention and control are complete and practical. According to the engineering analysis, the environmental impact of pollutant emissions is within the acceptable capacity of the local environment. The project construction has obvious social, economic and environmental benefits, conforms to the local development plan, and conforms to the environmental protection policy. Therefore, under the premise of implementing the various environmental protection measures and suggestions put forward in this evaluation, and analyzing from the perspective of environmental protection, the project construction is feasible. In the process of factory construction and production operation, the construction unit should ensure the investment amount and rational use of environmental protection funds, so that the "three simultaneous" work can be implemented.
8. How the public can consult the environmental impact report (simplified version)
If any unit or individual needs to inquire about the environmental impact report (simplified version) of this project, they can directly consult the construction unit or evaluation unit according to the above contact information; or fax the E-Mail to the evaluation unit, and the evaluation unit confirms that the requester is The public interested in this project will send a short copy of the report to the requester via E-Mail. The deadline for access to the abbreviated report is February 25, 2011. If you have comments or suggestions on environmental protection for this project, you can submit your comments to the construction unit or environmental assessment unit at the same time within 10 days from the date of this announcement, or you can reflect the written comments to the environmental protection management department for the construction unit and environmental impact assessment Reference for decision-making by units and government authorities.
Announcement issuance unit: Guixi Sanyuan Smelting Chemical Co., Ltd.
Announcement time: February 15, 2011
Scan the QR code to read on your phone
Relevant information

Time of issue : 2022-02-24 13:24:05

Time of issue : 2021-09-26 10:47:02

Time of issue : 2022-01-04 16:58:00
OFFICIAL ACCOUNTS
Welcome to follow our official public account

ONLINE MESSAGE
All rights reserved © 2021 Guixi Da san yuan Industry (Group) Co.,Ltd. Website: www.300.cn 赣ICP备2021009788号-1